Eastern Mediterranean UniversitySEMESTER PROJECT: KARGAfall Semester 17 Janury 2018[pic 1]Submitted to:  INDEX1.        INTRODUCTION        22.        MODEL AND METHODOLOGY        23.        NETWORK DIAGRAM        34.        PATHS / PATH MEAN / CRITICAL PATH        35.        EXPECTED TIME        36.        VARIANCE        47.        PATH PROBABILITIES        48.        PATH PROBABILITIES        89.        DISCUSSION        810.        OTHER COMMENTS        811.        CONCLUSION        912.        REFERENCES        9INTRODUCTIOnS:This project  contains activities for planning  an engagement party and the activity time estimates. The aim of this project is to show which of the path is most efficient in executing the planning of an engagement party project within a specific time frame. The expectation, duration of this Project and required steps for the planning has been prepared in this study. PERT analysis is used to analyse the role of the project network in planning an engagement party. Before we could make the planning for this project we would have to follow the steps required firstly, the process of this project will have to start with a drawing of the network diagram based on AOA approach. After that we will determine the paths, expected time, optimistic time, pessimistic time, and most likely time, and variance, standard deviation to calculate probability of achieving this program within a specific time frame or period.Model and methodology:             Program Evaluation and Review Technique (PERT) is a scheduling method originally designed to plan a manufacturing project by employing a network of interrelated activities, coordinating optimum cost and time criteria. PERT emphasizes the relationship between the time each activity takes, the costs associated with each phase, and the resulting time and cost for the anticipated completion of the entire project.PERT is an integrated project management system. These systems were designed to manage the complexities of major manufacturing projects, the extensive data necessary for such industrial efforts, and the time deadlines created by defence industry projects. Most of these management systems developed following World War I.

PERT was first developed in 1958 by the U.S Navy Special Projects Office on the Polaris missile system. Existing integrated planning on such a large scale was deemed inadequate, so the Navy pulled in the Lockheed Aircraft Corporation and the management consulting firm of Booz, Allen, and Hamilton. Traditional techniques such as line of balance, Gantt charts, and other systems were eliminated, and PERT evolved as a means to deal with the varied time periods it takes to finish the critical activities of an overall project.The Critical Path Method (CMP) is a mathematically based algorithm for scheduling a set of project and activities. It is an important tool for effective project management. Commonly used with all forms of projects, including; construction, software development, research projects, product development, engineering, and plant maintenance. Any project with interdependent activities can apply this method of scheduling. CMP developed in the 1950s by the US Navy.Network diagram:Creating a network diagram can be an involved process that begins after youve determined predecessors to your activity. Our network diagram is based on AOA model, which means the convention of designated activities, is determined by arrows. The total paths in our diagram are 10 paths.              Figure 1 show that time estimations for each activity. For instance, the activity “a” has 3 time estimations which show that optimistic time is 10, most-likely time is 15, and pessimistic time is 20 to finish this project. And the activities for this project are shown.Figure.1.[pic 2]In Figure 2, the critical paths for this Project which are a-c-d-h-i-o-q. Figure.2 also shows the expected time for each arrow, herewith expected time calculation and estimations which are shown in Table below. For this Project critical path represent the activities for this project Figure.2.[pic 3]paths, path mean and critical path:The path mean is the total value of each path. Hereby, each path mean has been calculated and which have the largest value of the entire path’s mean. This is a sequence of activities that leads from the starting node to finishing node.NumberParts/ActivitiesExpected times Part total (days)Variance Days totalσ2σ[pic 4]1a-c-d-h-l-o-q15+24.17+19.50+25+7.17+7+20.83=118.672.78+6.25+4.69+11.11+2.25+1+6.25=34.335.862a-c-d-i-m-q15+24.17+19.50+13.33+5+20.83=97.832.78+6.25+4.69+0.44+0.44+6.25=20.864.573a-c-d-i-dummy-n-q15+24.17+19.50+13.33+0+4.33+20.83=97.172.78+6.25+4.69+0.44+0+1+6.25=21.424.634a-c-d-i-dummy-p15+24.17+19.50+13.33+0+5.50=77.50 2.78+6.25+4.69+0.44+0+0.69=14.863.855a-c-d-j-k-n-q15+24.17+19.50+23+8.67+4.33+20.83115.502.78+6.25+4.69+5.44+1.78+1+6.25=28.195.316a-c-d-j-k-p15+24.17+19.50+23+8.67+5.5095.832.78+6.25+4.69+5.44+1.78+0.69=21.644.657a-c-e-f-g-n-q15+24.17+8.17+13.67+20.17+4.33+20.83=106.332.78+6.25+1.36+5.44+2.25+1+6.25=25.335.038a-c-e-f-g-p15+24.17+8.17+13.67+20.17+5.50=86.672.78+6.25+1.36+5.44+2.25+0.6918.784.339b-g-n-q8.83+20.17+4.33+20.83=54.171.36+2.25+1+6.25=10.863.2910b-g-p8.83+20.17+5.50=34.501.36+2.25+0.69=4.312.08

Download as:
txt (11.9 Kb)
pdf (729.2 Kb)
docx (686.2 Kb)
Continue for 6 more pages »
Read Full Essay
Only available on ReviewEssays.com
Citation Generator
MLA 7
CHICAGO
(2018, 10). Program Evaluation and Review Technique (pert) Analysis. ReviewEssays.com. Retrieved 10, 2018, from
“Program Evaluation and Review Technique (pert) Analysis” ReviewEssays.com. 10 2018. 2018. 10 2018 < "Program Evaluation and Review Technique (pert) Analysis." ReviewEssays.com. ReviewEssays.com, 10 2018. Web. 10 2018. < "Program Evaluation and Review Technique (pert) Analysis." ReviewEssays.com. 10, 2018. Accessed 10, 2018. Similar Essays Describe to Two Problem-Solving Techniques That You Would, or Have, Incorporated in Your Programming? One of the techniques one has implemented is the input-processing-output technique; this technique has facilitated students to solve small programming problems assignments. This technique; identifies 571 Words  |  3 Pages Analysis and Evaluation of Jean Watsons Theory of Caring Analysis and Evaluation of Jean Watsons Theory of Caring Since its establishment as a profession more than a century ago, Nursing has been a source 2,540 Words  |  11 Pages A Review of Management Techniques and Practices A Review of Management Techniques and Practices Over the past 150 years, Wells Fargo Bank has become one of the largest financial institutions in 4,088 Words  |  17 Pages Analysis of Hemingways Narrative Technique as a Short- Story Writer Analysis of Hemingways Narrative Technique as a Short- Story Writer For many years, the narrative technique of Hemingway has been under debate. Writers before him 2,223 Words  |  9 Pages Job Evaluation or Analysis I. Introduction Job evaluation or analysis is the process of systematically determining in detail the particular job duties and requirement, and the relative worth of 957 Words  |  4 Pages Evaluation of Traits in Program Excellence Evaluation of Traits in Program Excellence Trait 1 - Attendance Good attendance is essential for learning a subject matter; it helps one to gain 479 Words  |  2 Pages Evaluation of the Department of Revenue Training Program Evaluation of the Department of Revenue Training Program George Watlington Jr. Webster University Table of Contents Abstract.............................................. 3 Situation Analysis.................................... 4 Premise............................................... 12 Problem 5,347 Words  |  22 Pages Talent Management Program in Organization: A Critical Analysis on Prospect and Barriers on Its Implementation Tittle: Talent Management Program in Organization: A critical Analysis on Prospect and Barriers on Its Implementation Talent management program in organization is one of important 3,648 Words  |  15 Pages Similar Topics Economic Analysis Designing Your Programs Analysis Marketing Plan Nike Michael Strategic Analysis Bmw Gene Forrester Character Analysis Analysis Death You Plagerising Son High Quality Term Papers and Essays Join 349,000+ Other Members Get Better Grades Sign up © 2010–2020 ReviewEssays.com Browse Essays Join now! Login Support Site Map Privacy Policy Terms of Service Facebook

Get Your Essay

Cite this page

Program Evaluation And Pert Analysis. (June 10, 2021). Retrieved from https://www.freeessays.education/program-evaluation-and-pert-analysis-essay/