Design Consultant Main Contractor Contractual Completion Date
Project Manager                                 RW ArmstrongDesign ConsultantEWANMain ContractorConsolidated Contracting Engineering & Procurement SAL-OffshoreContractual Completion DateNo. of Days Left for CompletionWeather  ▢ Dusty   ▢ Sunny    ▢ Cloudy/Shower     [pic 6]Humidity▢ High    ▢ Medium    ▢ Low     [pic 7]Temperature 0C Max30Min20Contractors ManpowerSubcontractors ManpowerCategoryDay ShiftNight ShiftCategoryDay ShiftNight ShiftNameIndirectDirectSr. PROJECT MANAGER10PROJECT MANAGER10MECH-ENGINEER10ELEC-ENGINEER10QA/QC Engr.10MEP DRAUGHTS MAN60SECRETARY10ELECTRICAL FOREMAN10PLUMBING FOREMAN20Electricians40 Plumbers140   Duct Man00   CHW.Pipe Fitter00   Storekeeper10   Safety Officer10   Fire Fighting00   Time Keeper00   Mech-Helper050   Elec-Helper050         TOTAL4500TOTALThe contents of this report are a description of items related to the ongoing works or works completed during the day and indicative for the material & manpower on site, and should not in any case be considered a reference document for any contractual implication.EQUIPMENTI=IdleR=RepairTypeQtyHours WorkedStatusHilti M/c tool 01Jack hummer 01Drill M/C 02Grinder 4“02Grinder 7“03Grinder 8“02Air Blower02Welding M/c (PPR)03Heat Gun (PVC)02Manual pressure pump01Jigsaw cutter02Chawkshaw cutter02General hand tool box103 Ton Pickup / Grader ( 1 /0 )01Bus 14 Seater (1) / 34 Seat (1)02D/c Pickup01Material DemandVisitors to siteSub Contractor’s EquipmentItemUnitQtyName of supplierHDPE PIPES & FITTINGSVARCOSMOPLAST.PVC CONDUITES & ACCESSORIESVARM.K.The contents of this report are a description of items related to the ongoing works or works completed during the day and indicative for the material & manpower on site, and should not in any case be considered a reference document for any contractual implication.

Get Your Essay

Cite this page

Ongoing Works And C 02Grinder. (June 15, 2021). Retrieved from https://www.freeessays.education/ongoing-works-and-c-02grinder-essay/