Ability to Compare Variances Between the Scheduled Volume (at Multiple Levels) and Actual Production
Essay Preview: Ability to Compare Variances Between the Scheduled Volume (at Multiple Levels) and Actual Production
Report this essay
Ability to compare variances between the Scheduled volume (at multiple levels) and actual production.
* Ability to limit the scheduling and forecasting systems in-line with constrained commodity availabilities
* Capability to report feature mix rates – as separate reports – of undated orders, dated orders and forecast orders.
(scheduled/unscheduled/forecast orders)
* Capability to interrogate and report feature mix based on the forecast horizon
* Compare forecasted volumes against order bank (real orders)
* Compare order bank and forecast against constraints
* Provide forecast orders split by powertrain and major features
* Provide a global view of demand for a certain part and also the split demand for this part by Consumer Business
Groups
* Ability to allocate constrained commodities and end-items across Consumer Business Groups for regional program
development
* Ability for the user to maintain a database of globally shared commodities across CBGs
Report out on the buildability of the Production Program before the program is finalized
* Up-front evaluation of potential assembly part constraints (end-item or component(s) to an end-item) prior to
production scheduling volume freeze
* Ability to communicate the constraint to the scheduling system
* Ability to automatically limit the scheduling and forecasting systems in-line with constrained commodity availabilities
* Flexibility to limit the scheduling system based on known constraints
Ability to compare variances between the Scheduled volume (at multiple levels) and actual production.
* Ability to limit the scheduling and forecasting systems in-line with constrained commodity availabilities
* Capability to report feature mix rates – as separate reports – of undated orders, dated orders and forecast orders.
(scheduled/unscheduled/forecast orders)
* Capability to interrogate and report feature mix based on the forecast horizon
* Compare forecasted volumes against order bank
Essay About Separate Reports And Report Feature Mix
Essay, Pages 1 (305 words)
Latest Update: June 19, 2021
//= get_the_date(); ?>
Views: 66
//= gt_get_post_view(); ?>
Separate Reports And Report Feature Mix. (June 19, 2021). Retrieved from https://www.freeessays.education/separate-reports-and-report-feature-mix-essay/