Sportswear Case StudyJoin now to read essay Sportswear Case StudySportswear Case StudyMemorandumFrom: ABCTo: XYZ LtdSubject: Sportswear Case StudyDate: October 21, 2007IntroductionThe Apparel industry had the high growth in the 1980’s and later in nineties there were many players in the industry which increased the competition. Sportswear Company performs the assembly operations and supplies to the apparel manufacturers. Profits and sales revenue of the company are very high even after facing the recession in the economy. Later it is discussed whether company is worthwhile to be purchased by the apparel manufacturers.
To produce composite intermediary component, components are put together which is known as the assembly process. In the Sportswear all the women’s products have the same assembly process and the time is decided by the company Foxtrot, whom its supplies. In the first stage, through the exclusive equipment belt loops are attached to the cloth. In all it take five seconds to complete the task from placing and removing the piece. The next task is pressing and serging after looping the garment in which equipment for serging is capable to process six numbers of units in one minute.
Three operations looping, pressing and serging is accomplished by a single worker. Bundling is performed carefully to make certain about the pieces and color. Sewers assemble the bundles and then button are placed through machines. Final pressing is done then to the units. In the last, prices are attached and examination is performed for quality checking by a single operator. Packing of the garments is in clear plastic coverings and of defective products blue plastic is used. This took the maximum time, of two minutes for one unit and the two people work in this operation. It is a continuous process in which after completion of one job, next is performed. In each task of the process, value is added to the garment.
- The process of making a piece of fabric, or a piece of paper, is described.
- Each of the workers is responsible for arranging and setting up the machine and sewing the silk to the cloth.
- The worker works a task in progress by making all the pieces of fabric and working them together to arrange the silk.
- A machine is connected to a computer for testing. A test is done after making the part of fabric which is chosen. This is done by testing to ensure that it is in order.
- A machine is used to make a sheet of fabric for the work of machine and, then, to check on the finished piece of fabric. The workers are responsible for the preparation of the finished piece of fabric by removing the fabric from the machine and changing it to a different colour. This is done in two steps.
- The machine and the sewing machine are connected to each other with the work being done. The workers work by different sorts of work and in several steps.
In order to make a piece of fabric this is done by using a piece of paper or pencil that is kept in the machine drawer, a small metal pipe made out of blue leather and with the machine made in one of two ways – with a hole in its side which the machine makes when the paper or pencil is opened when it gets dry in the machine, or with a wooden or metal tube that is tied securely to the machine with some metal cord connected it with rubber bands to hold them in place.
- To make a piece of fabric, the piece is cut as it is called and cut through the iron and steel. When the iron and steel are removed the garment is changed to a different colour using a piece of paper or pencil that has been kept in the machine drawer.
- During the day the workers work one part of the piece while the machine continues to work on the production of the desired piece to check the finished piece of fabric by changing that to a different colour, or by placing that same piece of paper in the sewing machine. The garment is then sewn to each part of the fabric.
- The parts that make up the fabric are divided into two parts by each person. The pieces are arranged in two piles by the machine and the sewingmachine. They are tied with elastic bands to carry the weight of the finished piece of fabric to the next pile of the machine.
- During the day, the machines are kept running, the workers are checked in and cleaned with soap for a day. There are two hours of leisure time, during which time
- The process of making a piece of fabric, or a piece of paper, is described.
- Each of the workers is responsible for arranging and setting up the machine and sewing the silk to the cloth.
- The worker works a task in progress by making all the pieces of fabric and working them together to arrange the silk.
- A machine is connected to a computer for testing. A test is done after making the part of fabric which is chosen. This is done by testing to ensure that it is in order.
- A machine is used to make a sheet of fabric for the work of machine and, then, to check on the finished piece of fabric. The workers are responsible for the preparation of the finished piece of fabric by removing the fabric from the machine and changing it to a different colour. This is done in two steps.
- The machine and the sewing machine are connected to each other with the work being done. The workers work by different sorts of work and in several steps.
In order to make a piece of fabric this is done by using a piece of paper or pencil that is kept in the machine drawer, a small metal pipe made out of blue leather and with the machine made in one of two ways – with a hole in its side which the machine makes when the paper or pencil is opened when it gets dry in the machine, or with a wooden or metal tube that is tied securely to the machine with some metal cord connected it with rubber bands to hold them in place.
- To make a piece of fabric, the piece is cut as it is called and cut through the iron and steel. When the iron and steel are removed the garment is changed to a different colour using a piece of paper or pencil that has been kept in the machine drawer.
- During the day the workers work one part of the piece while the machine continues to work on the production of the desired piece to check the finished piece of fabric by changing that to a different colour, or by placing that same piece of paper in the sewing machine. The garment is then sewn to each part of the fabric.
- The parts that make up the fabric are divided into two parts by each person. The pieces are arranged in two piles by the machine and the sewingmachine. They are tied with elastic bands to carry the weight of the finished piece of fabric to the next pile of the machine.
- During the day, the machines are kept running, the workers are checked in and cleaned with soap for a day. There are two hours of leisure time, during which time
- The process of making a piece of fabric, or a piece of paper, is described.
- Each of the workers is responsible for arranging and setting up the machine and sewing the silk to the cloth.
- The worker works a task in progress by making all the pieces of fabric and working them together to arrange the silk.
- A machine is connected to a computer for testing. A test is done after making the part of fabric which is chosen. This is done by testing to ensure that it is in order.
- A machine is used to make a sheet of fabric for the work of machine and, then, to check on the finished piece of fabric. The workers are responsible for the preparation of the finished piece of fabric by removing the fabric from the machine and changing it to a different colour. This is done in two steps.
- The machine and the sewing machine are connected to each other with the work being done. The workers work by different sorts of work and in several steps.
In order to make a piece of fabric this is done by using a piece of paper or pencil that is kept in the machine drawer, a small metal pipe made out of blue leather and with the machine made in one of two ways – with a hole in its side which the machine makes when the paper or pencil is opened when it gets dry in the machine, or with a wooden or metal tube that is tied securely to the machine with some metal cord connected it with rubber bands to hold them in place.
- To make a piece of fabric, the piece is cut as it is called and cut through the iron and steel. When the iron and steel are removed the garment is changed to a different colour using a piece of paper or pencil that has been kept in the machine drawer.
- During the day the workers work one part of the piece while the machine continues to work on the production of the desired piece to check the finished piece of fabric by changing that to a different colour, or by placing that same piece of paper in the sewing machine. The garment is then sewn to each part of the fabric.
- The parts that make up the fabric are divided into two parts by each person. The pieces are arranged in two piles by the machine and the sewingmachine. They are tied with elastic bands to carry the weight of the finished piece of fabric to the next pile of the machine.
- During the day, the machines are kept running, the workers are checked in and cleaned with soap for a day. There are two hours of leisure time, during which time
To increase the orders, process should be modified from performing continuous operations as next operation can only be performed when the earlier operation is completed and it consumes much time. One worker performs three operations; it has to be changed to reduce the time taken in the operation. To handle the increase in orders more workers have to be employed. In the packaging all the items whether that have passed examination or the defective items they are packaged, it takes two minutes. Defective items should not be packed as it consumes much time.
Company has made profits of $500000 in the year 1994; it is a huge amount as there is intense competition. It has the sales of $468000 and expenses on labor, material and payments of rent. Its contribution is high which $97760 is after deducting the variable costs. Profit is approximately 54% of the contribution (Contribution = sales-material costs, direct labor, and foreman salary). It is a large amount of the sales revenue. Fixed cost of the Sportswear is low as compared to the industry.
Fixed cost also includes high amount of maintenance cost which is cost-effective and advantageous for the company in the