Traffic Count Survey in the Area of the Methanol Factory Site
Essay Preview: Traffic Count Survey in the Area of the Methanol Factory Site
Report this essay
TRAFFIC COUNT SURVEY IN THE AREA OF THE METHANOL FACTORY SITE61 Ayiou Pavlou str., 11071. IntroductionThe purpose of this traffic survey is to determine the number of passing vehicles at two given locations. This data establishes the traffic flow in two roads at specific time periods. These two roads are located in close proximity to the proposed methanol plant site. The area under survey is characterized by heavy industrial developments and agriculture land use. Because the presence of other industried facilities a good percentage of the traffic consists of heavy vehicles (see Table 1 and Table 2 of this report). The traffic in the future is expected to increase because of the wider area around the methanol plant site will be used by other industrial facilities related with the energy sector.The area road network in the area of the Methanol plant site includes two prime roads (seeFigure1): Nicosia – Limassol highway (A1) The old Nicosia-Limassol Road (B1)All other roads in the area are mostly used for serving the industrial areaFigure 1 : The road network of the wider area.A1 Nicosia – Limassol HighwayB1 Old Nicosia- Limasol RoadMari MethanolFactory Zygi[pic 1][pic 2][pic 3][pic 4][pic 5][pic 6]E1072. Traffic network in the area of the methanol plant siteThe traffic survey was conducted at two sites, site A and site B, in E107 roadway, located west of Zygi Village. Site A is situated outside the industrial Fuel Storage Area (Vitol Fuel Farm) (Figure 3). This roadway is mostly used by heavy vehicles. Site B is located, 900m west from Zygi, in E107 roadway. During the traffic survey the vehicles using the road leading to the methanol plant site were also recorded.The survey recording period was conducted from 06:00 – 18:00 to both sites of the roads on 26March 2015. Therefore the data includes both lanes of the roadways (see Figure 2). The results of the survey are presented on Table 1 and Table 2.Figure 2 : Traffic Survey Sites.[pic 7]NMethanolPlant SiteSite A Site B[pic 8][pic 9][pic 10]Figure 3 : Location of the traffic countsTable 1 : Traffic data collected at Site A.TimeLanes / Number of light vehiclesLanes / Number of heavy vehiclesiiiIIIIViiiIIIIV6:00-7:0051004 11 23 2 10 7:00-8:001734116 23 45 11 10 8:00-9:00132649 21 42 11 9 9:00-10:001734212 20 39 11 8 10:00-11:0092765 18 36 12 6 11:00-12:00142575 21 42 11 10 12:00-13:00132393 22 42 4 11 13:00-14:0091762 19 38 10 9 14:00-15:0081653 14 34 12 9 15:00-16:00112365 16 34 7 8 16:00-17:00153169 14 28 7 7 17:00-18:0091863 5 9 2 1 Total light vehicles1402845876Total heavy trucks 204 412 100 98
Essay About Traffic Count Survey And Area Of The Methanol Factory Site
Essay, Pages 1 (391 words)
Latest Update: June 30, 2021
//= get_the_date(); ?>
Views: 22
//= gt_get_post_view(); ?>
Traffic Count Survey And Area Of The Methanol Factory Site. (June 30, 2021). Retrieved from https://www.freeessays.education/traffic-count-survey-and-area-of-the-methanol-factory-site-essay/