Letter of Understanding
Essay Preview: Letter of Understanding
Report this essay
This letter is meant to further the understanding of the group in regards to the Highway 6 and 19th Street crossings. The company was assigned the responsibility of creating a detailed design idea for the pedestrian crossings from the client letter that was received August 16, 2010. The purpose of this letter is to clarify what our group can provide in regards to the project from a design perspective.

For years the crossings over Highway 6 and 19th Street have been inconvenient for pedestrians and commuters. The understanding of the company is to design a crossing to alleviate the congestion caused by the interaction between pedestrians and traffic as well as protect both parties from harms way. The creation of this design needs to adhere to the $6 Million dollar project budget, 16 week schedule, and criteria and regulations alluded to in the client letter. Going into this project the group is operating with the understanding that only the design will be a deliverable and that the actual construction process will be handled elsewhere. The final presentation will include the design idea as well as a practical implementation of this idea in accordance with the requirements.

Requirements: As outlined in client letter and clarification memo
Develop a bridge/tunnel design to traverse 19th Street and US Highway 6 in two separate places (if no signal at 19th and Elm Street)
Design must adhere to:
CPC design standards
CDOT standards
The Americans with Disabilities Act
The Clear Creek Urban Drainage and Flood Plain District
Golden Fire Department Standards
The International Building Code
Accomplish the connection of the Mines Park area to the Colorado School of Mines campus while paying special attention to aesthetics, adhering to the 16 week schedule, and staying within budget

Deliverables: As outlined in client letter and clarification memo
Final design of pedestrian crossing of US Highway 6 south of the intersection of 19th Street and US Highway 6
Design of the tunnel or other crossing across 19th Street (if no signal at 19th and Elm Street)
Comprehensive Schedule
Feasibility Report
Finite Map
Comprehensive Budget
Paragraph 4
Heading – Deliverables
Text

Get Your Essay

Cite this page

Detailed Design Idea And Understanding Of The Group. (June 13, 2021). Retrieved from https://www.freeessays.education/detailed-design-idea-and-understanding-of-the-group-essay/