Pages • 1
Bridge Project Essay Preview: Bridge Project Report this essay Bridge Write Up The problem that we have is we need to find a bridge that will fill a gap that is 12″ long, and 2.5″ wide. Our objective is to build a bridge that can hold up to 2.5kg at the most. The bridge must.