Abc Furnished Materials and Equipment Case Study TABLE OF CONTENTS[pic 1]1.0 GENERAL 22.0 OVERVIEW 23.0 SCOPE OF WORK 24.0 ABC FURNISHED MATERIALS AND EQUIPMENT 35.0 CONTRACTOR’S TEMPORARY FACILITIES 46.0 SCHEDULE 47.0 8.0 QUALITY ASSURANCE AND CONTROL 59.0 PROCUREMENT RESPONSIBILITIES 510.0 DATA AND REPORTING REQUIREMENTS 611.0 RULES, REGULATIONS, LICENSES, PERMITS and CERTIFICAABC 612.0 SPECIFICATIONS, STANDARDS and CODES 6 13.0 REFERENCE DRAWINGS 614.0 ATTACHMENTS 6Contract No.: Contract Description Reference: Dated: GENERALThe WORK to be performed under this CONTRACT is generally outlined in this section, however; references shall.