Pages • 3
Toshiba Production Case Essay Preview: Toshiba Production Case Report this essay We analyzed a Toshiba assembly line plan for a new subnotebook computer. The engineering section manager, Toshihiro Nakamura, wants to make changes to the line process as designed by the engineers. The basic assembly line equipment and space already exist within the Toshiba plant,.
Related Essay Topics:
Decision Support ModelMaximum Cycle TimeToshiba Assembly Line PlanUse Of A Tool