Pages • 1
United Case 1.The faults with the old system is that Southside Electric Cooperative (SEC) was using six disparate databases. Each database served a different purpose: outages, dispatches, electricity usage, geographic mapping, billing, and accounts receivable. (260) The major problem was that none of the databases were connected to each other which caused a delay in.