Pages • 1
Connected Systems Analysis Essay Preview: Connected Systems Analysis Report this essay PART A. Stage B is the bottleneck in the system. Processing capacity of this stage is on average 15,000- lbs/hour. Or 120,000 lbs per 8 hour shift If stage A is already been setup and there’s no changing to a different size, then there’s.