Pages • 1
Kombs Engineering Case Study CASE STUDY 1:KOMBS ENGINEERINGQ1: What was the reason for the loss of the contract?Ans: kombs make a contract with DOE in 1988 for five years. The kombs were focused on technical work so their performance were also good and DOE were also pleased with their technical performance but the main reason.