Pages • 1
Implement Civil Construction Plan Assignment 1: Works programmingYou are required to prepare a works program for a road upgrade and sealing project as provided in the attached drawing. Background information, methods and equipment assumptions that are outlined in case study 16 are to be used for this assignment, but keep in mind that you are using.