Airport Security
Essay Preview: Airport Security
Report this essay
Abstract
This term paper is about Al Udeid Air Installation and Security Program. The information that will be covered in the document consists of; Introduction to Al Udeid Military Instillation, Force Protection Conditions and Determining Assets Protection Levels, Al Udeid Installation Security Concept and Regional Threats, Installation Security Forces and the Conclusion. After reading this term paper the reader will have a better understanding about military operating procedures and protecting military assets form terrorist incidents.

Introduction to Al Udeid Military Instillation
Al Udeid Air Base is a Military Installation located in the country of Qatar, and is considered geographically the heart of the Middle East. Al Udeids mission is to provide Air and ground support for the War on Terrorism, as well as insuring global reach for US and Coalition Forces. Al Udeid is a diverse installation consisting of all branches of the US Military, British, Australian, Korean Forces, and Civilian Elements. Even with vast military diversity this installation is first and foremost an airport and is one of the largest in the region. The runway and surrounding tarmacs are adequate enough to support the largest aircraft both military and civilian. Although, the assortment and numbers are classified this installation has an adage “if it burns jet fuel, kicks ass, or moves troops. Its here!” It is estimated that either a military or commercial aircraft takes off or lands ever three minutes and operations are conducted twenty four hours a day and 365 days a year. Al Udeids passenger terminal is like any other airport and routinely conducts search and screaming procedures of aircraft, passenger, and cargo.

Force Protection Conditions and Determining Asset Protection Levels
In addition to a normal operating military installation, this installation adheres to all Force Conditions Levels (FPCONS) as well as integrates the Asset Protection Concept. These installation security programs must be executed with precision and all assets must be protected at all coasts. However, given that statement one must realize that not all assets are held with the same prestige. At deployed locations the Force Protection program is used in conjunction with Asset Protection Level procedures to provide the best protection possible for valued resources. Protection levels can change during periods of increased tension. For Example, FPCON Normal is the lowest protection level but, as unforeseen event increases security forces will amplify the FPCON LEVEL, FPCON DELTA being the highest. Virtually all contingencies cause security forces to increase readiness by implementing on of the four following FPCONS Levels;

FPCON NORMAL describes a situation of no current terrorist activity. The only security forces needed are enough to stop the everyday criminal, most likely civilian police forces.

FPCON ALPHA describes a situation where there is a small and general terrorist activity that is not predictable. However, agencies will inform personnel that there is a possible threat and standard security procedure review is conducted.

FPCON BRAVO describes a situation with somewhat predictable terrorist threat. Security measures taken by agency personnel may affect the activities of local law enforcement and the general public.

FPCON CHARLIE describes a situation when an instance occurs or when intelligence reports that there is terrorist activity imminent. Increased security by agencies are likely to cause problems for civilian law enforcement and the public, as people looking for access to agency facilities may be denied.

FPCON DELTA describes a situation when a terrorist attack is taking place or has just occurred. When applied for long periods of time, FPCON DELTA can cause hardships for civilian police and the public, as heightened agency security can impede their everyday duties. FPCON DELTA usually occurs only in the areas that are most vulnerable to or have been attacked.

Each base must use the FPCON actions designed to cope with events anticipated at that installation. For instance, a State Side or (CONUS) installation would not normally be required to develop an Asset Protection appendix for hostile air or major ground attack. However an over-seas or (OCONOS) base where the threat posed in a Host Nation is greater, that base must evaluate and implement Asset Protection Levels. Determining Asset protection levels provide the basis for programming security manpower and equipment. All military assets are designated with one of the four assigned protection levels. For example, certain systems, such as nuclear weapons and presidential support aircraft is always Protection Level 1(PL1) at the direction of authorities above the Air Force, conversely, the less important the resource the lower designation. Protection levels can change during periods of increased tension. For Example, as systems reach a heightened state of readiness like non-alert aircraft being placed on alert, their relative political and military importance increases and they may assume a higher protection level.

Protection Level 1 Resources
Assign PL1 to military installation resources for which the loss, theft, destruction, misuse of compromise would result in grate harm to the strategic capability of the United States. PL1 resources consist of Nuclear Weapons, Weapon Delivery Systems, Communications, Arial Space Aircraft, or systems that insure the ability to successfully execute contingency plans. This level of security must result in the greatest possible deterrence against hostile acts. Failing deterrence, security measures will provide maximum means to achieve detection, interception, and defeat of a hostile force before it is able to seize, damage, or destroy resources.

Protection Level 2 Resources
Assign PL2 to military installation resources for which the loss, theft, destruction, misuse of compromise would result in significant harm to the strategic capability of the United States. PL2 resources consist of Non-Nuclear Weapons, Expensive, few in numbers, or one of a kind systems, vital computer facilities and equipment, and Intelligence-gathering systems critical to military operational capabilities. This level of security must result in significant deterrence against hostile acts. Failing deterrence, this level of security will ensure a significant probability of detecting, intercepting, and defeating a hostile force before it is able to seize damage or destroy resources.

Protection Level 3 Resources
Assign

Get Your Essay

Cite this page

Force Protection Conditions And Determining Assets Protection Levels. (July 10, 2021). Retrieved from https://www.freeessays.education/force-protection-conditions-and-determining-assets-protection-levels-essay/