Board and Counsel Project
Board and Counsel Project
PA Licensed Engineering and Surveying Enterprises
Sellersville Borough, Pennsylvania
To: J.A. Dubin, Board of Supervisors, President
Ridgeview Township, Pennsylvania
For: Ridge Park Pavilion Area & Recycling Station
Date: February 13, 2006
Dear Board of Supervisors, President
Thank you for the invitation and I have come up with a proposal to your problem. Both building projects have given me quite the headache working and thinking of the best way to set up the areas but I have come up with solutions.

The first problem took me into two different ideas I went with my first idea of using the median theory. I measured out each distance between each pavilion. Then I found the midpoints of each side and attached them to the angle directly across from it. I read in the directions that I had to indicate the path which meant the path didnt have to be straight. So I look at the other measurements I had attaching the pavilions to the midpoint and found that the VFW and Founders pavilion was 4 cm towards the midpoint on the line connecting them two. Then it was 3 cm up towards the point were all three midpoint lines met. The meant each distance was 7 centimeters or 700 feet according to the scale. Then I had to get Mustang Pavilion to have the same distance. I noticed the different combinations I had. The one straight path I thought would be far enough but it came up 1 centimeter short. So I noticed the top side was 5 centimeters and the one connecting to that that went down was 2 centimeters long. Altogether 7 centimeters,

Get Your Essay

Cite this page

Ridge Park Pavilion Area And Different Ideas. (July 9, 2021). Retrieved from https://www.freeessays.education/ridge-park-pavilion-area-and-different-ideas-essay/