Measurements of Things
1. Project Country: Timor Leste
1. Project Location:
Name:
Longitude: Latitude:
1. Project Capacity: P.E. (Population Equivalent)
1. Source of Raw Water: *River/Lake/Reservoir/Other:
Nature of Raw Water: *Fresh/Salt/Other:
1. The Name of unloading Port:
The distance from Port to selected site: in km
1. The name of City nearest to the site:
The population of the City:
The distance from City centre to selected site: in km
1. Any available road access to the location site: Yes/No.
If Yes, the condition of the road:
If No, do river transport available to site:
1. Average Rainfall per annum in location area: mm/year
1. Surrounding areas:-
Any industry factory or factories within 5 km in radius at location: Yes/NO.
If yes, state the nature of factory/factories:
Any village or inhabitants within 5 km in radius at location: Yes/No.
If Yes, try to give briefly the number of village:
1. Price for water consumption in local currency per M³ for
Industrial: per M³
Commercial: per M³
Residential: per M³
1. Price for Electricity in local currency per kW/ for:
Industrial: per kW
Commercial: per kW
Residential: per kW
1. Price for Diesel in local currency per litre: /litre
Price for Petrol in local currency per litre: /litre
1. Wages and/or Salary in local currency per day/month for:
General
Essay About Source Of Raw Water And Project Country
Essay, Pages 1 (217 words)
Latest Update: June 30, 2021
//= get_the_date(); ?>
Views: 22
//= gt_get_post_view(); ?>
Related Topics:
Source Of Raw Water And Project Country. (June 30, 2021). Retrieved from https://www.freeessays.education/source-of-raw-water-and-project-country-essay/