Test Paper
Test Paper
1. The shorter the forecast period, the more accurately the forecasts tend to track what actually happens.
Operations Management
False
2. The optimum level of inspection minimizes the sum of inspection costs and the cost of passing defectives.
Operations Management
False
3. The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.
Operations Management
False
4. Concurrent Engineering is another term for sequential development.
Operations Management
False
5. Time-based systems” compensate employees according to the time the employee has worked and the amount of output
they produce.
Operations Management
False
6. One way to increase reliability is to:
Operations Management
eliminate backup component
improve preventive maintenance procedures
increase mean repair time
increase the number of independent components
none of the above
7. A basic question in capacity planning is:
4/26/2011 Symbiosis Institute of Management Stu…
spreadsheets.google.com/a/…/viewfor… 1/7
Operations Management
what kind is needed
how much is needed
when is it needed
all of the above
none of the above
8. The process of assigning tasks to workstations in such a way that the workstations have approximately equal time
requirements is called:
Operations Management
fair employment practices
idle time analysis
line balancing
cycle time optimization
none of the above
9. A tool used to organize data into logical categories is called a (n) ___.
Operations Management
Affinity diagram
Check list
Control Chart
Flow Chart
Relationship diagram
10. A control chart used to monitor the fraction of defectives generated by a process is the:
Operations Management
p-chart
R-chart
x-bar chart
c-chart
Gantt chart
1. The shorter the forecast period, the more accurately the forecasts tend to track what actually happens.
Operations Management
False
2. The optimum level of inspection minimizes the sum of inspection costs and the cost of passing defectives.
Operations Management
False
3. The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.
Operations Management

Get Your Essay

Cite this page

Standard Time And Normal Time. (July 8, 2021). Retrieved from https://www.freeessays.education/standard-time-and-normal-time-essay/